Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/moresimf/public_html/wp-includes/functions.php on line 6131
AITOC Use case Production – moresim.fi

Production equipment simulation​

Production equipment simulation​

Tactotek is an IPR company selling licenses for the molding/printing technology that can be used to create modular electronics; example plastic panel integrated AC touch controllers in electric cars (reduces weight and material needs). Company itself has an small production unit (that is mostly used for testing and presentations), main focus is on licensing technology to customers based on their needs. In AITOC-project they are developing production simulation tool, in which the data inputs and machine calculation (AI) is used in designing and optimization of sold production solution​